Block Manufacturer, Concrete Pre-caster,
Site Work Contractor

508-872-9668
Block Drawing
1   Home |    Products |    Services |     Testimonials | Block Drawing
2   Retaining Walls |    Material Bins |    Instant Structures |    Sea Walls |    Lakefront Walls |    Septic Systems | Block Drawing
3   Instant Loading Docks |    Emergency Retaining Walls |    Wall Repair |    Excavation |    Demolition Services | Block Drawing
4   Pavers |    Property Markers |    Wetland Markers |    Parking Stops |    Park Benches |    Guard Rails Block Drawing
5   Deck Footings |    Post Footings    Driveway/Fence Pillars |    Light Pole Foundations |    Solar Ballast Footings | Block Drawing
6   Natural Stone Veneer |    Designer Finishes |    Caps and Crowns |    Custom Precast |    Force Protection | Block Drawing
7   Jersey Barriers |    Jersey Barrier and Block Rentals |    Concrete Tent Ballast Blocks |    Clunker Blocks | Block Drawing
8   Mulch |    Tumbled Glass Aggregates |    Aggregates |    Mesh Beds |    Pervious Green Driveways | Block Drawing
9   Technical Library |    Gallery |    Environment |    Contact Us | Block Drawing



Manufactured with Concrete

Green options also available;
including Agg-Crete, Plas-Crete, Glass-Crete and EPS-Crete. See: Environment Page






No-Disturb Zone Demarcation Markers for Buffer Wetland Areas

4 X 4 concrete bound marker

Conigliaro Block manufactures and installs permanent concrete No-Disturb markers along wetland buffer zones as required by many Conservation Commissions in Massachusetts.

Our markers are 4” x 4” x 48” or 6" X 6" X 48" and are manufactured from solid concrete with imbedded rebar.

Typical Conservation Commission Requirements for No-Disturb Zone Demarcation include:

To maintain the perpetual integrity of the “No Disturb Zone” and to ensure that there will be no encroachments into this Zone by the applicant or future owners of the subject property, the Commission may require the No-Disturb Zone to be marked on the ground, at the applicant’s expense, with permanent markers. These markers shall be made of weather resistant material (i.e. granite, or concrete), and the Commission shall determine their number, size and location. The Commission may require one or more of these markers to bear, on their upland side, writing (i.e. permanent plaque or engraving) that shall read “Protected Resource Area” or other wording to that effect.

Click Here for a printable brochure

Call today for a free No-Disturb Zone Demarcation Marker quote!
(888) CONIG – 25


©2021 Conigliaro Block, Inc.
701 Waverly Street, Framingham, Massachusetts 01702
(508) 872-9668 | (508) 653-6672 fax

 Ashland,Framingham, Natick, Wayland, Marlborough, Southborough, Northborough, Hopkinton, Holliston, Sherborn,
Wellesley, Hudson, Clinton, Milford, Stow, Upton, Grafton, Waltham, Dover, Sudbury, Brookline, Needham, Dedham,
Berlin, Bellingham, Franklin, Blackstone, Whitinsville, Walpole, Cambridge, Chelsea, Boston, Taunton, Wrentham, Winchester, Hopedale, Mendon, Millis, Brockton, Quincy, Westford, Concord, Lexington, Lincoln, Ayer,Harvard, Acton, Boxborough, Bedford, Carlisle, Billerica, Chelmsford, Lowell, Southbridge, Princeton, Shrewsbury, Westborough